'round the world and home again, that’s the sailor’s way…

  • 0 Posts
  • 10 Comments
Joined 1 month ago
cake
Cake day: March 21st, 2025

help-circle


  • Some of the gotchas I’ve encountered:

    • Land is very hard to finance, I ended up saving until I could buy cash
    • Building ‘on-grid’ would have saved a lot in permitting and setup (luckily I had electric service at the road). If you are going off-grid, I would check the permitting requirements for sewage/water and the average depth of wells near your spot, this can get expensive quick if you have to drill deep.
    • I’m working with an architect atm but we’ve pivoted to using ICF blocks for wall construction as they are made in the USA and tariffs would have killed me otherwise.

    I would expect the cost of the building, using the highest quality materials (not luxury) to still beat (by like 100k) the cost of buying an equivalant old home in the area I purchased; however, if we are talking pre-housing-price-explosion of the last few years, I would say building would be more expensive.




  • Bought 5 acres (with 1.5 of those acres flat on a hill) about ~20 min outside a medium city, ~1 hour equidistant from 2 very large cities. Geotechnical engineers have been to the property, report submitted to the county (took months). Sewage engineers have been out to the property and approved the drain field (took weeks). Well will be drilled once the county approves the build site. It’s slow going but it will be worth it in the end! My only fear is trump cancelling the rural broadband fund as I am slated to get the fiber cable run to my property line within a year. Staying with starlink for longer will not be awesome, but oh well, sacrifice.