    From a grid stability point, you can’t produce more than is used, else you get higher frequencies and/or voltages until the automatics shut down. It’s already a somewhat frequent occurence in germany for the grid operator to shut down big solar plants during peak hours because they produce way more power than they can dump (because of low demand or the infrastructure limiting transfer to somewhere else)

    Negative prices are the grid operator encouraging more demand so it can balance out the increased production.

    • kippinitreal@lemmy.world
      link
      fedilink
      English
      arrow-up
      2
      ·
      1 month ago

      Spot on! I hoped this comment would be higher! The main problem isn’t corps not making money, but grid stability due to unreliability of renewables.

      To be fair, the original tweet is kinda shit to begin with. They’ve unnecessarily assigned monetary value to a purely engineering (physics?) problem.

    • MaxMalRichtig@discuss.tchncs.de
      link
      fedilink
      English
      arrow-up
      1
      ·
      1 month ago

      Well I wasn’t expecting to find THE right answer in the comments already. Kudos!

      And to everyone reading through this post: If you have questions, need more explanations or want to learn more about the options that we have to “stabilize” a renewable energy system and make it long term viable, just ask!

    • antimongo@lemmy.world
      link
      fedilink
      English
      arrow-up
      1
      ·
      1 month ago

      Piggybacking on your grid stability point, another issue I don’t see getting addressed here is ramp rate.

      If we install enough solar where 100% of our daytime load is served by solar, that’s great. But what about when the solar starts to drop off later in the day?

      A/Cs are still running while the sun is setting, the outside air is still hot. People are also getting home from work, and turning on their A/Cs to cool off the house, flipping on their lights, turning on the oven, etc.

      Most grids have their peak power usage after solar has completely dropped off.

      The issue then becomes: how can we serve that load? And you could say “just turn on some gas-fired units, at least most of the day was 100% renewable.”

      But some gas units take literal hours to turn on. And if you’re 100% renewable during the day, you can’t have those gas units already online.

      Grid operators have to leave their gas units online, running as low as they can, while the sun is out. So that when the peak hits, they can ramp up their grid to peak output, without any help from solar.

      There are definitely some interesting solutions to this problem, energy storage, load shifting, and energy efficiency, but these are still in development.

      People expect the lights to turn on when they flip the switch, and wouldn’t be very happy if that wasn’t the case. Grid operators are unable to provide that currently without dispatchable units.

    • Mobilityfuture@lemmy.world
      link
      fedilink
      English
      arrow-up
      0
      ·
      1 month ago

      As someone with a technical background this is the stupidest problem with solar that I don’t get… just turn off the panels in groups until generation is closer to demand… how have engineers not figured that out. And if they have why does this still get written about.

      Someone is an idiot. Maybe it’s me?

      • antimongo@lemmy.world
        link
        fedilink
        English
        arrow-up
        1
        ·
        1 month ago

        I’m adjacent to this problem, so I have a little context, but am not an expert at all.

        To my knowledge, we don’t have granular control over panels. So we can shut off legs of a plant, but that’s a lot of power to be moving all at once.

        Instead, prices are set to encourage commercial customers to intake more power incrementally. This has a smoother result on the grid, less chance of destabilizing.

        A customer like a data center could wait to perform defragmentation or a backup or something until the price of power hits a cheap or negative number.